Hiroshimasteg Bridge
The bridge was built over the Landwehr Canal in 1987. ZINKPOWER Berlin provided corrosion protection for the steel components.
Today, 30 years later, the duplex system is still in a very good condition. The layer thicknesses of the hot-dip galvanizing measures between 190-230 µm. The layer thickness of the entire system , comprising hot-dip galvanizing plus base and top coat, measures between 360-385 µm. According to experts from the Institute, there is no need for medium- or long-term maintenance with hot-dip galvanizing.
© Hiroshimasteg 1 Berlin, Lienhard Schulz