ZinkPower Buk
Heat exchangers capture and reuse waste heat eg for the
pretreatment baths, for heating the building and to provide hot
water. Rainwater is collected for further use. The exhaust air is
purified by in-house developed filter systems.
Through our ZinkPower group affiliation we are able to process a
wide product range from the screw to the steel girders. The
ZinkPower logistics concept guarantees our customers optimized
deliveries of the highest quality.
In Poland, the Kopf Group operates 2 galvanizing plants: since
the spring of 2010, ZinkPower Wielkopolska near Konin is in
production with kettle dimensions of 15.5 meters x 2.4 meters x 3.2
meters. Since 2005 ZinkPower Szczecin operates a kettle with
dimensions of 13 meters x 1.5 meters x 3 meters.
Martin Kopf is responsible for international business and Zbigniew
Miodowski is the contact person for the Polish market. Contact:
martin.kopf zinkpower.com and zbigniew.miodowski@zinkpower.com

