-
MissionHistoryManagementLocationsReferencesQuality PolicyEnvironmental CareServicesCareersPress InformationExhibitions & Events
|
Feuerverzinkung Schopsdorf GmbH & Co. KG
|
Additional Data
| Management |
|
Herbert Otten |
| Plant Management |
|
Thomas Häuser |
| Sales Management |
|
Monika Bernhardt |
| Quality Management |
|
Peter Leucke |
| Kettle dimensions |
|
12,5 m x 1,85 m x 3,25 m |
| Product range |
|
Hot dip
galvanizing Zinc spraying Powder coating Color
coating ZINCOLOR® Gitterroste |
| Receipt/Delivery of goods |
|
| Mon - Fri |
6:00am - 6:00pm | Special
arrangements possible |
Powder coating: For components made of steel, galvanized
steel and aluminium in RAL and special colours.
Color
coating: For components made of steel, galvanized steel and aluminium
in RAL and special colours.
History
| 1995 |
|
Founding by Roßberg group |
| 1997 |
|
Certified according to DIN EN ISO 9002 |
| 2002 |
|
Takeover by KOPF group |
| 2003 |
|
Certified according to DIN EN ISO
9001:2000 |
Quality
We guarantee galvanizing in accordance with DIN EN ISO 1461.
The
quality management system in force at our plant has been reviewed and evaluated
and meets the require-ments of DIN EN ISO 9001.
Production processes are monitored continuously to ensure uniformly high
product quality.
Our staff has gathered many years of experience, which is supplemented by
continuing advanced training. Their competence, coupled with management’s
continuous efforts to improve technological processes, guarantee high quality.
We have earned the certificate for “Hot Dip Galvanized Building Components
Made of Hot Rolled Structural Steel and Hot Dip Galvanized Die-Cast Steel”
issued by the Institut für Oberflächentechnik GmbH, Schwäbisch Gmünd, upon
completion of the review and inspection required for award of the Seal of
Conformity (“Ü-Zeichen") with the provisions of Construction
Regulations List A, Part 1 (version 1999/1). We are member of the
Industrieverband Feuerverzinken.
Environmental care
Environmental care is a fundamental aspect of everything we
do. Exhaust heat is recovered with heat-pump systems.
This significantly reduces energy consumption. Waste materials are
returned to the processing cycle or recycled.
No waste water from our
production facilities is diverted into the sewer system. Modern
exhaust and filter systems guarantee consistent compliance with European
environmental protection laws.
Service
- Express-Service
- Consulting in the construction phase to ensure the material will be
suitable for hot dip galvanizing
- Corrosion protection consulting
- Full-Service Logistics
- Support for acceptance tests
- Regular deliveries to the areas of Berlin, Wittenberg/Dessau,
Magdeburg/Stendal
- Completion of parts and systems in accordance with the sequence of
assembly
- Deliveries of materials to the building site in accordance with the
sequence of assembly europewide
- Storing
- Packing
- Sandblasting
- Paint removal
|
 |
|
|